Masongsong Associates Engineering Limited (MAEL) and Municipal Project

Management (MPM) have been retained by 2585231 Ontario Inc. to conduct

a Municipal Class Environmental Assessment (Class EA) for the extension of

Anderson Avenue between Castlemore Avenue and Street ‘B’ as per the 

figure below. This project is being planned under Schedule ‘C’ of the Municipal 

Engineers Association (MEA) Municipal Class EA document Municipal Class 

Environmental Assessment. 

Problem-Opportunity Statement

A Problem/Opportunity statement for this study was determined based on the 

Official Plan Policies, as well as the MTPS which emphasize the need for 

Anderson Avenue Extension as a North/South collector road.  Should the 

Anderson Avenue Extension proceed, a parallel route to Markham Road will 

connect Castlemore Avenue to the south with Major Mackenzie to the north.


The purpose of the study is to determine specific road parameters for the road 

extension to accommodate future traffic, pedestrians, and cyclists’ requirements 

with the development of the sites along the Markham Road Corridor, within the 

Mt. Joy Secondary Plan. Other major considerations in this study include guidance 

for servicing recommendations including stormwater management.


“To support existing uses and future developments in the study area bounded by Major 

Mackenzie Drive, Bur Oak Drive, Markham Road, and the GO rail corridor, additional 

north-south capacity is required for all modes of transportation. The infrastructure 

will be supportive of the transportation and servicing objectives in the current Markham Transportation Secondary Plan (MTSP) and the Mount Joy Secondary Plan.”